Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
*
JNC TN9440 2000-008, 79 Pages, 2000/08
This report summarizes the operating and irradiatlon data of the experimental reactor "JOYO" 35th cycle. Irradiation tests in the 35th cycle are as follows: (1)C-type irradiation rig (C4F) (a)High burnup performance test of advanced austenitic stainless steel cladding fuel pins (in collaboration with France) (2)C-type irradiation rig (C6D) (a)Large diameter fuel pins irradiation tests (3)Core Materials Irradiation Rig (CMIR-5) (a)Cladding tube materials irradiation tests for "MONJU" (4)Structure Materials Irradiation Rigs (SMIR) (a)Decision of material design base standard of structure materials for prototype reactor and large scale reactor (5)Upper core structure irradiation Plug Rig (UPR-1-5) (a)Upper core neutron spectrum effect and accelerated irradiation effect (6)SurVeillance un-instrument Irradiation Rig (SVIR) (a)Confimation of surveillance irradiation condition for "JOYO" (b)Material irradiation tests (based on a contract with universities) The maximum burnup driver assembly "PFD253" reached 67,600 MWd/t (pin average).
*
JNC TN9440 2000-005, 164 Pages, 2000/06
This report summarizes the operating and irradiation data of the experimental reactor "JOYO" 34th cycle, and estimates the 35th cycle irradiation condition. Irradiation tests in the 34th cycle are as follows: (1)C-type irradiation rig (C4F) (a)High burnup perfomance test of advanced austenitic stainless steel cladding fuel pins (in collaboration with France) (2)C-type irradiation rig (C6D) (a)Large diameter fuel pins irradiation tests (3)Absorber Materials Irradiation Rig (AMIR-6) (a)Run to absorber pin's cladding breach (4)Core Materials Irradiation Rig (CMIR-5) (a)Cladding tube materials irradiation tests for "MONJU" (5)Structure Materials Irradiation Rigs (SMIR) (a)Decision of material design base standard of structure materials for prototype reactor and large reactor (6)Upper core structure irradiation Plug Rig (UPR-1-5) (a)Upper core neutron spectrum effect and accelerated irradiation effect (7)SurVeillance un-instrument Irradiation Rig (SVIR) (a)Confirmation of surveillance irradiation condition for "JOYO" (b)Material irradiation tests (in collaboration with universities) The maximum burnup driver assembly "PFD537" reached 68,500MWd/t(pin average).
*
JNC TN9440 2000-002, 157 Pages, 2000/02
This report summarizes the operating and irradiation data of the experimental reactor "JOYO" 33rd cycle, and estimates the 34th cycle irradiation condition. Irradiation tests in the 33rd cycle are as follows: (1)B-type irradiation rig (B9) (a)High burn up performance tests of "MONJU" fuel pins, advanced austenitic steel cladding fuel pins, large diameter fuel pins, ferrite steel cladding fuel pins and large diameter annular pellet fuel pins (b)Mixed carbide and nitride fuel pins irradiation tests (in collaboration with JAERI) (2)C-type irradiation rig (C4F) (a)High burn up performance test of advanced austenitic stainless steel cladding fuel pins (in collaboration with France) (3)C-type irradiation rig (C6D) (a)Large diameter fuel pins irradiation tests (4)Absorber Materials Irradiation Rig (AMIR-6) (a)Run to absorber pin's cladding breach (5)Core Materials Irradiation Rig (CMIR-5) (a)Cladding tube materials irradiation tests for "MONJU" (6)Core Materials Irradiation Rig (CMIR-5-1) (a)Core materials irradiation tests (7)Structure Materials Irradiation Rigs(SMIR) (a)Material irradiation tests (in collaboration with universities) (b)Surveillance back up tests for "MONJU" (8)Upper core structure Irradiation Plug Rig (UPR-1-5) (a)Upper core neutron spectrum effect and accelerated irradiation effect. The maximum burnup driver assembly "PFD516" reached 64,300MWd/t (pin average).
Power Reactor and Nuclear Fuel Development Corporation
PNC TN9360 95-002, 98 Pages, 1995/11
no abstracts in English
Power Reactor and Nuclear Fuel Development Corporation
PNC TN9360 95-001, 104 Pages, 1995/11
no abstracts in English
Power Reactor and Nuclear Fuel Development Corporation
PNC TN9360 94-002, 100 Pages, 1994/02
no abstracts in English
Power Reactor and Nuclear Fuel Development Corporation
PNC TN9360 94-001, 95 Pages, 1994/02
no abstracts in English
*; *; *; *
PNC TN1410 91-097, 17 Pages, 1991/12
This report describes the results of project JD-12 including JD-9. The objective of this project is to develop a remote surveillance system with a trigger devices which consist of ray monitor and electronic sealing switch. The concept of the system is going to be applied to an automatich storage of new MOX plant which is fully automated.
Seki, Seiichi; ; ; ; Aoki, Isao
PNC TN8440 91-014, 5 Pages, 1991/06
None